Friday, August 25, 2006



Construction Halts for Birth

We've been busily filling in the bales with cob and
light-clay but had to take a break for the dove who has nested at the top of the wall.

As you can see by the photo, there is quite a bit of room between the top of the bales and the roof plate on this end (west). This is all to be filled with light-clay.

The rest of the pictures show the filling we've done. I probably didn't need to do that much in some places but I get carried away and it will just make it easier to plaster.

Same corner after light clay.............................................and before light clay.


The dove nest is to the left of the small window on top of the bales.