Construction Halts for Birth
We've been busily filling in the bales with cob and light-clay but had to take a break for the dove who has nested at the top of the wall.
As you can see by the photo, there is quite a bit of room between the top of the bales and the roof plate on this end (west). This is all to be filled with light-clay.
The rest of the pictures show the filling we've done. I probably didn't need to do that much in some places but I get carried away and it will just make it easier to plaster.
Same corner after light clay.............................................and before light clay.
The dove nest is to the left of the small window on top of the bales.